[1] X. Wang, J.R. McDonald, Modern power system planning, McGraw-Hill, 1994.
[3] S. Fan, J.R. Liao, R. Yokoyama,L. Chen, W.J. Lee, “Forecasting the Wind Generation Using a Two-Stage Network Based on Meteorological Information,” IEEE Trans.Powr Syst., vol. 24, no. 2, pp. 474–482, June 2009.
[4] G. Sideratos, N.D. Hatziargyriou, “An Advanced Statistical Method for Wind Power Forecasting,” IEEE Trans. Powr Syst., vol. 22, no. 1, pp. 258–265, Feb. 2007.
[5] M.O. Buygi, G. Balzer, H.M. Shanechi, M. Shahidehpour, “Market-Based Transmission Expansion Planning,” IEEE Trans. Powr Syst., vol. 19, no. 4, pp. 2060–2067, Nov. 2004.
[6] M.O. Buygi, H.M. Shanechi, G. Balzer, M. Shahidehpour, N. Pariz, “Network Planning in Unbundled Power Systems,” IEEE Trans. Powr Syst., vol. 21, no. 3, pp. 1379–1387, Aug. 2006.
[7] M. Mazadi, W.D. Rosehart, O. P. Malik, J. A. Aguado, “Modified Chance-Constrained Optimization Applied to the Generation Expansion Problem,” IEEE Trans. Power Syst., vol. 24, no. 3, pp. 1635-1636, Aug. 2009.
[8] H. Yu, C.Y. Chung, K.P. Wong, and J.H. Zhang, “A Chance Constrained Transmission Network Expansion Planning Method With Consideration of Load and Wind Farm Uncertainties,” IEEE Trans. Powr Syst., vol. 24, no. 3, pp. 1568–1576, Aug. 2009.
[9] B. Alizadeh, S. Dehghan, N. Amjady, S. Jadid, and A. Kazemi, “Robust Transmission System Expansion Planning Considering Planning Uncertainties”, IET Gener., Trans. & Dist., vol. 7, no. 11, pp. 1318–1331, Nov. 2013.
[10] S. Dehghan, A. Kazemi, and N. Amjady, “Multiyear Transmission Expansion Planning Using Information Gap Decision Theory and Augmented ε-Constrained Method”, IET Gener., Trans. & Dist., vol. 8, no. 5, pp. 828–840, May 2014.
[11] S. Dehghan, N. Amjady, and A. Kazemi, “Two-Stage Robust Generation Expansion Planning: A Mixed Integer Linear Programming Model”, IEEE Trans. Powr Syst., vol. 29, no. 2, pp. 584–597, March 2014.
[12] G.C. Oliveira, S. Binato, and M.V.F. Pereira, “Value-Based Transmission expansion planning of Hydrothermal Systems Under Uncertainties,” IEEE Trans. Powr Syst., vol. 22, no. 4, pp. 1429–1435, Nov. 2007.
[13] M. Carrión, J.M. Arroyo, N. Alguacil, “Vulnerability-Constrained Transmission Expansion Planning: A Stochastic Programming Approach,” IEEE Trans. Powr Syst., vol. 22, no. 4, pp. 1436–1445, Nov. 2007.
[14] J.H. Roh, M. Shahidehpour, L. Wu, “Market-Based Generation and Transmission Planning With Uncertainties,” IEEE Trans. Powr Syst., vol. 24, no. 3, pp. 1587–1598, Aug. 2009.
[15] V. Miranda, L.M. Proenca, “Probabilistic Choice vs. Risk Analysis – Conflicts and Synthesis in Power System Planning” IEEE Trans. Powr Syst., vol. 13, no. 3, pp. 1038–1043, Aug. 1998.
[16] B.G. Gorenstin, N.M. Campodonico, J.P. Costa, M.V.F. Pereira, “Power System Expansion Planning Under Uncertainty,” IEEE Trans. Powr Syst.,vol. 8, no. 1, pp. 129–136, Feb. 1993.
[17] R. Romero, A. Monticelli, A. Garcia, S. Haffner, “Test Systems and Mathematical Models for Transmission Network Expansion Planning,” IEE Gener. Transm. Distrib., vol. 149, no. 1, pp. 27–36, Jan. 2002.
[18] S. Dehghan, A. Kazemi, S. Jadid, “A Composite Generation and Transmission Expansion Planning Pinpointing the Optimal Location of Candidate Generation Unit,” 24rd International Power System Conference, PSC 2009.
[19] J.R. Birge, F. Louveaux, Introduction to stochastic programming, Springer, 1997.
[20] A.N. Halter, G.W. Dean, Decision Under Uncertainty, South-Western Publishing Co., 1971.
[21] The Reliability Test System Task Force, “IEEE Reliability Test System”, IEEE Trans. Powr Syst., vol. 14, no. 3, pp. 1010–1020, Aug. 1999.