بهشتینیا،م. قاضی وکیلی،ن. (1394)، ارزیابی الگوریتم های زمانبندی تولید کارگاهی انعطافپذیر و مقایسه آنها با الگوریتم ژنتیک دوبخشی، مجله علمی پژوهشی مدل سازی در مهندسی، سال 13، شماره40.
[2] Asadi Gangraj, E, & Nahavandi, N. (2014) “A Metaheuristic approach for Batch Sizing and Scheduling Problem in Flexible Flow Shop with Unrelated Parallel Machines”. International Journal of Computer Applications, 97, 31-36.
[3]
Sadjadi, SJ,
Aryanezhad, MB &
Ziaee, M. (2008) “The General Flowshop Scheduling Problem: Mathematical Models The General Flowshop Scheduling Problem: Mathematical Models”, Mathematical Models. Journal of Applied Sciences, 8, 3032-3037.
[4] Shahnazari-Shahrezaei, P, Tavakkoli-Moghaddam, R & Kazemipoor, H. (2011) “Solving a bi-objective manpower scheduling problem considering the utility of objective functions”, IJE Transactions, 24, 251-262.
[5] Benavides, AJ, Ritt, M, & Miralles, C. (2014) “Flow shop scheduling with heterogeneous workers”, European Journal of Operational Research, 237, 713–720.
[6] Carniel, GC, Benavides, AJ & Ritt, M. (2013) “Models for the inclusion of workers with disabilities in flow shop scheduling problems”, Simpósio Brasileiro de Pesquisa Operacional.
[7] Mehravaran, Y & Logendran R. (2013) “Non-permutation flowshop scheduling with dual resources”, Expert Systems with Applications, 40, 5061–5076.
[8] Sánchez, HS & Montoya Torres, JR. (2009) “Mathematical model of workforce scheduling problem in flow shop with makespan minimization”, Journal of Computational Design and Engineering, 4, 190–201.
[9] Behnamian, J. (2014) “Scheduling and worker assignment problems on hybrid flow shop with cost-related objective function”, International Journal of Advanced Manufacturing Technology, 74, 267-283.
[10] Carniel, GC, Benavides, AJ & Ritt, M. (2015) “Including workers with disabilities in flow shop scheduling”,
IEEE International Conference on Automation Science and Engineering.
[11] Huq, F, Cutright, K & Martin C. (2004) “Employee scheduling and makespan minimization in a flow shop with multi-processor work stations: a case study”, international journal of management science, 32, 121 – 129.
[12] همتیان،ح. فریدون،ع. رجبپور، م (1389)، بهینه سازی پانل ساندویچی هسته منشوری براساس الگوریتم گروه ذرات، مجله علمی پژوهشی مدل سازی در مهندسی، سال 8، شماره20.
[13] Pal, A, Singh, SB, & Deep, K. (2011) “Use of Particle Swarm Optimization Algorithm for Solving Integer and Mixed Integer Optimization Problems”, International Journal of Computing Science and Communication Technologies, 4, 663-667.
[14] Ramanan, TR, Iqbal, M & Umarali, K. (2014) “A particle swarm optimization approach for permutation flow shop scheduling problem”, International Journal for Simulation and Multidisciplinary Design Optimization, 5, 2014.
[15] Liu, B, Wang, L, & Jin, Y. (2008) “An effective hybrid PSO-based algorithm for flow shop scheduling with limited buffers”, Computers & Operations Research, 35, 2791 – 2806.
[16] Sha, DY, & Lin, H. (2010) “A multi-objective PSO for job-shop scheduling problems”, Expert Systems with Applications, 37, 1065–1070.
[17] Qiu, X, & Lau, HYK. (2010) “An AIS-based Hybrid Algorithm with PSO for Job Shop Scheduling Problem”,
IFAC Proceedings, 43, 350–355.
] رستمی،ع. نوروزی،ا. مختاری، ه. نعمتی، ی. (1394)، مسئله بهینهسازی پورتفولیوی چندهدفه با اهداف حداکثر کردن بازده، حداقل کردن ریسک و حداقل کردن تعداد دارایی، مجله علمی پژوهشی مدل سازی در مهندسی، سال 14، شماره45.
[20] Nouri, BV, Fattahi, P, Tavakkoli-Moghaddam, R, & Ramezanian, R. (2014) “A general flow shop scheduling problem with consideration of position based learning effect and multiple availability constraints”, The International Journal of Advanced Manufacturing Technology, 73, 601-611.
[21] Naderi, B, Zandieh, M, & Ghomi, SMT. (2009) “Scheduling Sequence-Dependent Set-up Time Job Shops with Preventive Maintenance”, International Journal of Advanced Manufacturing Technology, 43, 170–181.
[22] Jabbarzadeh, F, Zandieh, M, & Talebi, D. (2009) “Hybrid flexible Flow Shops with Sequence-Dependent Setup Times and Machine Availability Constraints”, Computers & Industrial Engineering, 57, 949–957.