[1] M. Bevilacqua, M. Braglia, (2000) “The analytic hierarchy process applied to maintenance strategy selection” Reliability Engineering and System Safety, Vol.70, No. 1,  pp.71-83.
                                                                                                                [2] V. Kayvanfar, GH.M.   Komaki, A. Aalaei, M. Zandieh, (2014)  “Minimizing total tardiness and earliness on unrelated parallel machines with controllable processing times”, Computers & Operations Research, Vol .41, pp.31-43.
                                                                                                                [3] G. Schmidt, (2000) “Scheduling with limited machine availability” European Journal of Operational Research, Vol.121, No. 1, pp.1–15.
                                                                                                                [4] M. Tavana, Y. Zarook,  J. Francisco, A. Santos, (2015) “  An integrated three-stage maintenance scheduling model for unrelated parallel machines with aging effect and multi-maintenance activities ”, Computers & Industrial Engineering, Vol. 83, pp. 226–236.
                                                                                                                [5] M. Afzalirad, J. Rezaeian, (2017) “A realistic variant of bi-objective unrelated parallel machine scheduling problem: NSGA-II and MOACO approaches” Applied Soft Computing, Vol. 50,  pp.109–123.
                                                                                                                [6] Y.M. Lin, M.E. Pfund, J.W. Fowler, (2011) “Heuristics for minimizing regular performance measures in unrelated parallel machine scheduling problems”, Computers & Operations Research, Vol.38, No. 6, pp. 901–916.
                                                                                                                [7] T.C.E. Cheng, J. H. Chou, L. Y. Dar, (2011 ) “Unrelated parallel-machine scheduling with deteriorating maintenance activities”, Computers & Industrial Engineering, Vol. 60, No. 4, pp. 602-605.
                                                                                                                [8] M. Rambod,  J. Rezaeian, (2014)   “Robust meta-heuristics implementation for unrelated parallel machines scheduling problem with rework processes and machine eligibility” , Computers & Industrial Engineering, Vol. 77, pp. 15–28.
                                                                                                                [9] بهشتینیا، م.، قاضی وکیلی، ن. (1394)" ارزیابی الگوریتمهای زمانبندی تولید کارگاهی انعطافپذیر و مقایسه آنها با الگوریتم ژنتیک دو بخشی". مجله مدلسازی در مهندسی، دوره 13، شماره 40.
                                                                                                                [10] حسینی، س. م. ح.، حسنی، ع. ا. (1396) " توسعه یک الگوریتم شاخه وکران برای حل مسأله زمانبندی در سیستم تولید جریان کارگاهی مونتاژی" مجله مدلسازی در مهندسی، دوره 15، شماره 51.
                                                                                                                [11] حسنی، ع. ا. (1396) "الگوریتم فراابتکاری ترکیبی برای حل یک مدل دو هدفه استوار جریان کارگاهی انعطافپذیر دو مرحلهای با خط مونتاژ اختصاصی تحت عدم قطعیت" مجله مدلسازی در مهندسی، دوره 15، شماره 50.
                                                                                                                [12] فخرزاد، م. ب.، رجائی، ب. (1396) "نگهداری پیشگیرانه در زمانبندی ماشینهای موازی نامرتبط با احتساب اثر زوال و زمان آمادهسازی" فصلنامه علمی-پژوهشی مطالعات مدیریت صنعتی، سال پانزدهم، شماره 45.
                                                                                                                [13] A. J. Ruiz-Torres, G. Paletta, R. M’Hallah, (2017) “Makespan minimisation with sequence-dependent machine deterioration and maintenance events”, International Journal of Production Research, Vol. 55, No. 2, pp. 462–479.
                                                                                                                [14] M. Abedi, H. Seidgar, H. Fazlollahtabar, (2017) “Hybrid scheduling and maintenance problem using artificial neural network based meta-heuristics” Journal of Modelling in Management, Vol.12, No.3, pp.525–550.
                                                                                                                [15] L. H. Su, M. C. Hsiao, H. Zhou, F. D. Chou, (2018) “ Minimizing the number of tardy jobs on unrelated parallel machines with dirt consideration” Journal of Industrial and Production Engineering, Vol. 35, No.6, pp.383–393.
                                                                                                                [16] L. Qinming, M. Dong, F. F. Chen, W. Lv, C. Ye, (2019) “Single-machine-based joint optimization of predictive maintenance planning and production scheduling” Robotics and Computer-Integrated Manufacturing, Vol. 55, pp.173-182.
                                                                                                                 
                                                                                                                [17] H. Tian,  Y. Shuaijing, L. Wenchang (2019) “Parallel Machine Scheduling on Jobs and Partial Maintenance Activities due to job-Dependent Machine Deteriorations” American Journal of Mathematical and Management Sciences, pp. 1-11.
                                                                                                                [18] O. Jadidi , S. b. Cavalieri, S. Zolfaghari, (2015) “An improved multi-choice goal programming approach for supplier selection problems”, Applied Mathematical Modelling, Vol. 39, No. 14, pp. 4213–4222.
                                                                                                                [19] S. A.Torabi, N. Sahebjamnia, S. A. Mansouri, M. Aramon Bajestani, (2013) “A particle swarm optimization for a fuzzy multi-objective unrelated parallel machines scheduling problem” Applied Soft Computing, Vol.13, No.12, pp.4750–4762.
                                                                                                                [20] K. Deb, S. Agarwal, T. Meyarivan, (2002) “A fast and elitist multiobjective genetic algorithme: NSGA-II,” IEEE Trans. Evol. Comput, Vol. 6, No. 2, pp. 182-197.
                                                                                                                [21] E. Zitzler, K. Deb, L.Thiele, (2000) “Comparison of multiobjective evolutionary algorithms: Empirical results”, Evolutionary Computation journal, Vol.8, No.2,  pp. 125-148.
                                                                                                                [22] J.R. Schott, (1995) “Fault tolerant design using single and multi criteria genetic algorithms” Master's Thesis, Boston, MA: Department of Aeronautics and Astronautics Massachusetts Institute  of technology.