1. Nasiri, M.M., F. Kianfar. (2012). “A guided tabu search/path relinking algorithm for the job shop problem”. The International Journal of Advanced Manufacturing Technology, Vol.58, pp. 1105-1113.
2. Nasiri, M.M., F. Kianfar. (2012). “A GES/TS algorithm for the job shop scheduling”. Computers & Industrial Engineering, Vol.62, pp. 946-952.
3. Beck, J.C., T. Feng, J.-P. Watson. (2011). “Combining constraint programming and local search for job-shop scheduling”. INFORMS Journal on Computing, Vol.23, pp. 1-14.
4. Amin-Naseri, M.R., M.A. Beheshti-Nia. (2009). “Hybrid flow shop scheduling with parallel batching”. International Journal of Production Economics, Vol.117, pp. 185-196.
5. Shakhlevich, N.V., Y.N. Sotskov, F. Werner. (2000). “Complexity of mixed shop scheduling problems: A survey”. European Journal of Operational Research, Vol.120, pp. 343-351.
6. Nasiri, M.M., F. Kianfar. (2011). “A GA/TS algorithm for the stage shop scheduling problem”. Computers & Industrial Engineering, Vol.61, pp. 161-170.
7. Carlier, J., E. Pinson. (1989). “An algorithm for solving the job-shop problem”. Management science, Vol.35, pp. 164-176.
8. Lawrence, S. (1984). “Resource constrained project scheduling: an experimental investigation of heuristic scheduling techniques (supplement)”. Graduate School of Industrial Administration, Carnegie-Mellon University, Pittsburgh, Pennsylvania,
9. Essafi, I., Y. Mati, S. Dauzère-Pérès. (2008). “A genetic local search algorithm for minimizing total weighted tardiness in the job-shop scheduling problem”. Computers & Operations Research, Vol.35, pp. 2599-2616.