نویسندگان
1 استادیار
2 ارشد
چکیده
کلیدواژهها
عنوان مقاله [English]
نویسندگان [English]
Abstract—the purpose of this paper is to compare two artificial intelligence algorithms for forecasting supply chain demand. In first step data are prepared for entering into forecasting models. In next step, the modeling step, an artificial neural network and support vector machine is presented. The structure of artificial neural network is selected based on previous researchers' results. For measuring errors we use Mean squared error and we use another index for time which is used running the algorithms. The results show that artificial neural network can forecast more accurate meanwhile support vector machine is faster.
کلیدواژهها [English]
Ayers,J.,(2000), HandBook Of chain management, APICS
|
[1]
|
Chorpa,S., and Meindl,P.,(2001) supply chain management:strategy,planning and operation, prentice hall,
|
[2]
|
Zhao, Xie and Wei,(2002) "The impact of forecast errors on early order commitment in a supply chain.," Decision Sciences, pp. 251-280,
|
[3]
|
ARMSTRONG,J.,(2001) Principles of forcasting, Kluwer Academic Publisher,
|
[4]
|
Apleydin,E.,(2010) Introduction to machine learning., MIT press,
|
[5]
|
Standler,H., and Kilger, C.,(2008) supply chain management and advanced planning concepts model and case studies, springer,
|
[6]
|
Henkoff,R.,(1994) "Delivering The Goods," fortune,
|
[7]
|
Lee,H., Padmanabhan,v., and Whang, S.,(1997) "The Bullwhip Effect In Supply Chains," Sloan Management Review, pp. 93-102,
|
[8]
|
کاظمی, ب., (1381)مدیریت تولید, تهران: دانشگاه پیام نور,
|
[9]
|
Anderson, J. A., and Rosenfeld, E.,(1988) Neurocomputing: Foundations of Research, Cambridge: MIT Press,
|
[10]
|
Burges,(1998) "Atutorial on support vector machine for pattern recognition," International conference on data mining and knowledge discovery,
|
[11]
|
Aburto,L., and Weber, R.,(2007) "Improved supply chain management based on hybrid demand forecasts," Applied Soft Computing, pp. 136-144,
|
[12]
|
Gutierreza, S. R., Solis,O. A., and S. Mukhopahyayb, (2008) "Lumpy demand forecasting using neural networks," International Journal of Production Economics, pp. 409-420,
|
[13]
|
Niu, Shi and Wu,(2012) "Short-term load forecasting using bayesian neural networks learned by Hybrid Monte Carlo algorithm," Applied Soft Computing, pp. 1822-1827,
|
[14]
|
Guanghui,W.,(2012) "Demand Forecasting of Supply Chain Based on Support Vector Regression Method," Procedia Engineering, pp. 280-284,
|
[15]
|
شهرابی, ج., وموسوی, س., (1387)“تحلیل تاثیر روش های متداول پیش بینی بر اثرشلاقی و پیشنهاد مدلی برای کنترل آن در زنجیره تامین,” دومین کنفرانس داده کاوی ایران,
|
[16]
|
Carbonneau,R., Laframboise, K., and Vahidov, R.,(2007) "Application of machine learning techniques for supply chain demand forecasting," European Journal of Operational Research,
|
[17]
|
Mojaveri, Mousavi, Heydar and Aminian,(2009) "Validation and Selection between Machine Learning techniques and traditional methods to reduce bullwhip effect," World Academy of Science, Engineering and Technology,
|
[18]
|
Kandananond,K.,(2012) "A Comparison of Various Forecasting Methods for Autocorrelated Time Series," International Journal of Engineering Business Management,
|
[19]
|
Hall,S.,(2012) Applied Economic Forecasting techniques, harvester,
|
[20]
|
Demuth,H and Beale, M.,(1997) Neural Network Toolbox User's Guide, Version 3.0, The Math Works, Inc,
|
[21]
|
Ali, M. M., & Boylan, E. J. (2010). On the effect of non-optimal forecasting methods on supply chain downstream demand. IMA journal of management mathematics , 23, pp. 81-89.
|
[22]
|