1 [ سیدحسامالدین ذگردی، محمد علی بهشتینیا، "یکپارچگی زمانبندی حمل و نقل در زنجیره تامین با وسائط نقلیه دارای ظرفیتهای
متفاوت"، مجله پژوهشنامه حمل و نقل، دوره 6 ، شماره 3 )پیاپی 20 ،) 1388 ، صفحه 244 - 233 .
[2] A.D. Yimer, and K. Demirli, "A genetic approach to two-phase optimization of dynamic supply chain scheduling", Computers & Industrial Engineering, Vol. 58, No. 3, 2010, pp. 411-422.
[3] I. Averbakh, "On-line integrated production–distribution scheduling problems with capacitated deliveries", European Journal of Operational Research, Vol. 200, No. 2, 2010, pp. 377-384.
[4] M. Rostamian Delavar, M. Hajiaghaei-Keshteli, and S. Molla-Alizadeh-Zavardehi, "Genetic algorithms for coordinated scheduling of production and air transportation", Expert Systems with Applications, Vol. 37, No. 12, 2010, pp. 8255-8266.
[5] B. Scholz-Reiter, E.M. Frazzon, and T. Makuschewitz, "Integrating manufacturing and logistic systems along global supply chains", CIRP Journal of Manufacturing Science and Technology, Vol. 2, No. 3, 2010, pp. 216-223.
[6] R. Bhatnagar, P. Mehta, and C. Chong Teo, "Coordination of planning and scheduling decisions in global supply chains with dual supply modes", International Journal of Production Economics, Vol. 131, No. 2, 2011, pp. 473-482.
[7] W.-K. Yeung, T.-M. Choi, and T.C.E. Cheng, "Supply chain scheduling and coordination with dual delivery modes and inventory storage cost", International Journal of Production Economics, Vol. 132, No. 2, 2011, pp. 223-229.
[8] S.-C. Liu, and A.-Z. Chen, "Variable neighborhood search for the inventory routing and scheduling problem in a supply chain", Expert Systems with Applications, Vol. 39, No. 4, 2012, pp. 4149-4159.
[9] Y. Mehravaran, and R. Logendran, "Non-permutation flowshop scheduling in a supply chain with sequence-dependent setup times", International Journal of Production Economics, Vol. 135, No. 2, 2012, pp. 953-963.
[10] H. Osman, and K. Demirli, "Economic lot and delivery scheduling problem for multi-stage supply chains", International Journal of Production Economics, Vol. 136, No. 2, 2012, pp. 275-286.
[11] I. Averbakh, and M. Baysan, "Approximation algorithm for the on-line multi-customer two-level supply chain scheduling problem", Operations Research Letters, Vol. 41, No. 6, 2013, pp. 710-714.
[12] J. Ren, D. Du, and D. Xu, "The complexity of two supply chain scheduling problems", Information Processing Letters, Vol. 113, No. 17, 2013, pp. 609-612.
[13] S. Kabra, M.A. Shaik, and A.S. Rathore, "Multi-period scheduling of a multi-stage multi-product bio-pharmaceutical process", Computers & Chemical Engineering, Vol. 57, 2013, pp. 95-103.
[14] M.A. Shaik, and C.A. Floudas, "Improved unit-specific event-based continuous-time model for short-term scheduling of continuous processes: Rigorous treatment of storage requirements", Industrial & engineering chemistry research, Vol. 46, No. 6, 2007, pp. 1764-1779.
[15] C.A. Ullrich, "Integrated machine scheduling and vehicle routing with time windows", European Journal of Operational Research, Vol. 227, No. 1, 2013, pp. 152-165.
[16] A. Thomas, et al., "A resource constrained scheduling problem with multiple independent producers and a single linking constraint: A coal supply chain example", European Journal of Operational Research, Vol. 236, No. 3, 2014, pp. 946-956.
[17] E. Selvarajah, and R. Zhang, "Supply chain scheduling at the manufacturer to minimize inventory holding and delivery costs", International Journal of Production Economics, Vol. 147, Part A, 2014, pp. 117-124.
[18] T. Sawik, "Joint supplier selection and scheduling of customer orders under disruption risks: Single vs. dual sourcing", Omega, Vol. 43, 2014, pp. 83-95.
[19] E. Muñoz, et al., "Supply chain planning and scheduling integration using Lagrangian decomposition in a knowledge management environment", Computers & Chemical Engineering, Vol. 72, 2015, pp. 52-67.
[20] B. Han, and W.J. Zhang, "On-line Supply Chain Scheduling Problem with Capacity Limited Vehicles", IFAC-PapersOnLine, Vol. 48, No. 3, 2015, pp. 1539-1544.
[21] B. Han, et al., "On-line supply chain scheduling for single-machine and parallel-machine configurations with a single customer: Minimizing the makespan and delivery cost", European Journal of Operational Research, Vol. 244, No. 3, 2015, pp. 704-714.
[22] D.C. Pinha, et al., "Supply Chain Scheduling: A Motorcycle Assembly Case Study", IFAC-PapersOnLine, Vol. 48, No. 3, 2015, pp. 1527-1532.
[23] W. Liu, et al., "A scheduling model of logistics service supply chain based on the mass customization service and uncertainty of FLSP’s operation time", Transportation Research Part E: Logistics and Transportation Review, Vol. 83, 2015, pp. 189-215.
[24] J. Pei, et al., "Serial batching scheduling of deteriorating jobs in a two-stage supply chain to minimize the makespan", European Journal of Operational Research, Vol. 244, No. 1, 2015, pp. 13-25.
[25] J. Ehm, and M. Freitag, "The Benefit of Integrating Production and Transport Scheduling", Procedia CIRP, Vol. Vol. 41, 2016, pp. 585-590.
[26] W. Liu, et al., "The optimal decision of customer order decoupling point for order insertion scheduling in logistics service supply chain", International Journal of Production Economics, Vol. 175, 2016, pp. 50-60.
[27] S. Bruque-Cámara, J. Moyano-Fuentes, and J.M. Maqueira-Marín, "Supply chain integration through community cloud: Effects on operational performance", Journal of Purchasing and Supply Management, Vol. 22, No. 2, 2016, pp. 141-153.
[28] C.N. Potts, and L.N. Van Wassenhove, "A decomposition algorithm for the single machine total tardiness problem", Operations Research Letters, Vol. 1, No. 5, 1982, pp. 177-181.