[1] Naeim, F., Kelly, J.M., (1999). “Design of seismic isolated structures; from theory to practice”. John Wiley & Sons, Chichester, UK.
[2] Cheng, F., Jiang, H., Lou, K., (2008). “Smart structures, Innovative Systems for Seismic Response Control”. Taylor & Francis Group, New York, US.
[3] Kilar, V., Koren, D., (2010). “Simplified inelastic seismic analysis of base – isolated structures using the N2 method”. Earthquake Engineering & Structural Dynamics, Vol. 39(9), pp. 967–989.
[4] Kilar, V., Koren, D., (2009). “Seismic behaviour of asymmetric base isolated structures with various distributions of isolators”. Engineering Structures, Vol. 31(4), pp. 910-921.
]5[ سازمان مدیریت و برنامه ریزی کشور، (1385). "دستورالعمل بهسازی لرزهای ساختمانهای موجود". نشریه شماره 360، جمهوری اسلامی ایران.
[6] American Society of Civil Engineers, (2005). “Prestandard and Commentary for the Seismic Rehabilitation of Buildings”. FEMA356, Federal Emergency Management Agency, Washington D.C, US.
[7] Higashino, M., Okamoto, S., (2006). “Response Control and Seismic Isolation of Buildings”. Taylor & Francis Group, New York, US.
[8] Chatzidaki, F., (2011). “Optimum design of base isolated RC structures”. Institute of Structural Analysis and Anti-seismic Research, Athens, Greece.
[9] Ozdemir, G., Constantinous, M., (2010). “Evaluation of equivalent lateral force procedure in estimating seismic isolator displacement”. Soil Dynamics & Earthquake Engineering, Vol. 30(10), pp. 1036-1042.
[10] Applied Technology Council, (1996). “Seismic evaluation and retrofit of concrete buildings”. ATC40, Redwood City, California, US.
[11] Chopra, A.K., Goel, R.K., (2002). “A modal pushover analysis procedure for estimating seismic demands for buildings”. Earthquake Engineering & Structural Dynamics, Vol. 31(3), pp. 561–582.
[12] Shakeri, K., Shayanfar, M.A., Kabaeyasawa, T., (2010). “A story shear-based adaptive pushover for estimating seismic demands of buildings”. Engineering Structures, Vol. 32(1), pp. 174–183.
[13] Shakeri, K., Tarbali, K., Mohebbi, M., (2012). “An adaptive modal pushover procedure for asymmetric – plan buildings”. Engineering Structures, Vol. 36, pp. 160-172.
[14] Shakeri, K., (2013) “Optimum weighted mode combination for nonlinear static analysis of structures”. 3(2), pp. 259-270.
[15] Doudoumis, N.I., Kotanidis, C., (2006) “A comparative study on static push-over and time-history analysis methods in base isolated buildings”. First European Conference on Earthquake Engineering and Seismology, Geneva, Switzerland, September, paper No. 420.
[16] Providakis, C.P., (2008). “Pushover analysis of base isolated steel–concrete composite structures under near-fault excitations”. Soil Dynamics & Earthquake Engineering, Vol. 28(4), pp. 293-304.
[17] Fajfar, P., (2000) “A nonlinear analysis method for performance-based seismic design”. Earthquake Spectra, Vol. 16(3), pp. 573–592.
[18] Koren, D., Kilar, V., (2011). “The applicability of the N2 method to the estimation of torsional effects in asymmetric base-isolated buildings”. Earthquake Engineering & Structural Dynamics, Vol. 40(8), pp. 867–886.
[19] Kilar, V., Petrovčič, S., Koren, D., Šilih, S., (2013) “Cost viability of a base isolation system for the seismic protection of a steel high-rack structure”. International Journal of Steel Structures, Vol. 13(2), pp. 253-263.
[20] Structural Engineers Association of Northern California, (1986) “Tentative Seismic Isolation Design Requirements”. San Francisco, California, US.
[21] International Code Council, (2009). “International Building Code”. Country Club Hills, US.
[22] Computers and Structures Inc., (2011). “SAP 2000: Linear and Nonlinear Static and Dynamic Analysis and Design of Three-dimensional Structures”. Berkeley, California, US.