]1 [محمد پازکی. " روشی موثر در تعیین نوع خطا در خطوط انتقال با استفاده از طبقهبندی کنندۀ بیز مبتنی بر کرنل " مدل سازی در مهندسی، 16، 52، 1397، 11-11.
[2]
J. Endrenyi,
S. Aboresheid,
R.N. Allan, "The present status of maintenance strategies and the impact of maintenance on reliability" IEEE Transactions of Power System, vol. 16, no. 4, Nov. 2001, pp. 638–646.
[3]
L. Bertling,
R. Allan,
R. Eriksson, "A reliability-centered asset maintenance method for assessing the impact of maintenance in power distribution systems " IEEE Transactions of Power System, vol. 20, no. 1, Feb. 2005, pp. 75-82.
[4] P. Hilber, V.Miranda, M. A. Matos, L. Bertling, "Multiobjective optimization applied to maintenance policy for electrical networks" IEEE Transactions of Power System, vol. 22, no. 4, Nov. 2007, pp. 1675–1682.
[5]
S. K. Abeygunawardane, P. Jirutitijaroen, "New state diagrams for probabilistic maintenance models" IEEE Transactions of Power System, vol. 26, no 4, Nov. 2011, pp 2207-2213.
]6[ بهروز کشته گر، محمود میری. "ارائه روشی جدید برای ارزیابی قابلیت اعتماد سازهها" مدل سازی در مهندسی, 12, 36, 1393, 42-29.
[7] M. Stopczyk, B.Sakowicz and G. J. Anders. "Application of a semi-Markov model and a simulated annealing algorithm for the selection of an optimal maintenance policy for power equipment" International Journal of Reliability and Safety, vol. 2, no. 1/2, 2008, pp. 129–145.
[8] C. L.Tomasevicz, S.Asgarpoor, "Optimum maintenance policy using semi-Markov decision processes" Electric Power Systems Research, vol. 79, no. 9, Sep. 2009, pp. 1286-1291.
[9] H. Ge, S. Asgarpoor, "An analytical method for optimum maintenance of substation" IEEE/PES Transmission and Distribution Conference and Exposition, Chicago, Apr. 2008, pp. 1–6.
[10] H. Ge, S. Asgarpoor, “Reliability evaluation of equipment and substations with fuzzy Markov processes” IEEE Transactions of Power System, vol. 25, no. 3, Aug 2010, pp. 1319–1328.
[11] T. Krontiris, “Fuzzy systems for condition assessment of equipment in electric power systems,” Ph.D. thesis, University of Darmstadt, Dept. Elect. and Comp. Eng, Darmstadt, Germany, 2012.
[12] T.Chan, L.Chen-Ching, C.Jong-Woong, “Implementation of reliability-centered maintenance for circuit breakers’ IEEE Power Engineering Society General Meeting, San Francisco, CA, June 2005, pp. 684-690.
[13] J.Schlabbach, T.Berka, “Reliability-centered maintenance of MV circuit-breakers” IEEE 9th Int. Conf. Power Tech Proceedings, Sep. 2001, pp.1 -5.
[14] G.Balzer, K.Bakic, H. J. Haubrich et al, “Selection of an optimal maintenance and replacement strategy of H.V. equipment by a risk assessment process,” CIGRE Session, Paris, 2006.pp. 1–9.
[15] T. Orlowska, G. Balzer, M. Halfmann, et al, “Life cycle management of circuit-breakers by application of reliability centered maintenance,” CIGRE Session, Paris, 2000, pp. 1–8.
[16] S. K. Abeygunawardane, P. Jirutitijaroen, “Application of probabilistic maintenance models for selecting optimal inspection rates considering reliability and cost tradeoff,” IEEE Transactions on Power Delivery, vol. 29, no. 1, Feb. 2014, pp. 178–186.
[17] G. K. Chan, S. Asgarpoor, “Optimum maintenance policy with Markov processes” Electric Power Systems Research, vol. 76, no. 6-7, Apr. 2006, pp. 452–456.
[18] S. K. Abeygunawardane, P. Jirutitijaroen, H. Xu, “Adaptive maintenance policies for aging devices using a Markov decision process,” IEEE Transactions of Power System, vol. 28, no. 3, Aug. 2013, pp. 3194-3203.
[20] B. Falahati, S. Member, Y. Fu, M. J. Mousavi, S. Member, “Reliability Modeling and Evaluation of Power Systems with Smart Monitoring,” IEEE Transaction on Smart Grid, vol. 4, no. 2, June. 2013, pp. 1087 – 1095.
[21] Y.Han, Y.H. Song, “Condition monitoring techniques for electrical equipment—A literature survey” IEEE Transactions on Power Delivery, vol. 18, no. 1, Jan. 2003, pp. 4–13.
[22] J. Zhong, R. Zheng, W. Yang, F.Wu, “Construction of smart grid at information age” Power System Technology, vol. 33, no. 13, 2009, pp. 12–18.
[23] K.D. McBee, M.G. Simes “Utilizing a smart grid monitoring system to improve voltage quality of customers” IEEE Transactions on Smart Grid, vol. 3, no. 2, June. 2012, pp. 738 – 743.
[24] S. Ullo, A.Vaccaro, G.Velotto “The role of pervasive and cooperative sensor networks in smart grids communication,” in Proceedings of 15th IEEE Mediterranean electrotechnical Conference, MELECON, Valletta, April. 2010, pp. 443-447.
[25] A. Bose “Smart transmission grid applications and their supporting infrastructure” IEEE Transactions on Smart Grid. vol. 1, no. 1, April. 2010, pp.11–19.
[26] T. Bilke “Phasor measurement impact for regional reliability awareness” In Proceedings of 2008 IEEE Power Energy Society General Meeting Conversion and Delivery of Electrical Energy in the 21st Century, Pittsburgh, 2008, pp. 1–2.
[27] J.H. Chow, A. Chakrabortty, M.Arcak, B. Bhargava, A.Salazar ”Synchronized phasor data based energy function analysis ofdominant power transfer paths in large power systems,” IEEE Transactions on Power Systems. vol. 22, no. 2, April. 2007, pp. 727 – 734.
[28] J. S Wilson, "Sensor technology handbook", Elsevier Press, 2004.
[29] G.Bolch. S.Greiner. H.de Meer. K.Trivedi, “Queueing Networks and Markov Chains: modeling and performance evaluation with computer science applications,” John wiley&Sons, Inc. 1998.
]30[ کاظم ابراهیمی، راحله لعلهئی، "به کار گیری مدل زنجیرههای مارکوف گسسته جهت پیش بینی رفتار پرتفوی وام بانک ها" مدل سازی در مهندسی، 14، 47، 1395، 76-61.
[31] CEA Equipment Reliability Information System, “Forced outage performance of transmission equipment”, Canadian Electric Association, Canada.1995-1999.
[32] J. Vikesjo, “Reliability Comparison between Different 400 kV Substation Designs”, M.S. Thesis, Chalmers University of Technology, Goteborg, Sweden, 2008.
[33] R. Billinton, W. Li “Reliability evaluation of electric power systems using Monte Carlo simulation method,” 1st Edition Plenum Press, New York, 1994.
[34] R.U. Nighot, “Incorporating Substation and Switching Station Related Outages in Composite System Reliability Evaluation”, M.S. Thesis, University of Saskatchewan,
Saskatoon, 2003.
[35] NERC, "AC Substation Equipment Failure Report", online available: http://www.nerc.com, December 2014.